Master Prioritized Sprint Plan (March 2026)

Status: active for already-in-flight cross-lane work; WAP 1.2.1 completion is governed by the compliance program

Effective date: 2026-03-15

Planning horizon: 3 consecutive sprints

This plan resolves priority collisions for work already in flight. For new WAP 1.2.1 work and any completion/conformance claim, the dependency authority is docs/waves/wap-1.2.1-compliance-program.json, summarized by docs/waves/WAP_1_2_1_PLANNING_BASELINE.md.

Priority Model

  1. P0: unblock and close committed bedrock compliance tickets already in the active sprint lane.
  2. P0: close networking dependency chain required before protocol-native implementation blockers can move.
  3. P1: close already-active runtime/compliance work before starting fresh feature breadth.
  4. P1: keep transport/security follow-up work limited to deferred depth or newly discovered blockers.
  5. P2: run maintenance in parallel only when it does not starve P0/P1.

Canonical Sources

  • docs/waves/WORK_ITEMS.md
  • docs/waves/NETWORKING_GAP_MASTER.md
  • docs/waves/SPRINT_PLAN_2026-03_BEDROCK_COMPLIANCE.md
  • docs/waves/MAINTENANCE_WORK_ITEMS.md
  • docs/wml-engine/work-items.md
  • docs/waves/WAP_1_2_1_PLANNING_BASELINE.md
  • docs/waves/wap-1.2.1-compliance-program.json

WAP Compliance Rebase (2026-07-24)

Source/spec planning for the selected WAP-215 Class C profile is complete: 198 selected parent rows, 761 planned clause fixtures, and a 13-sprint/79-item execution program. The conservative implementation snapshot is 23 implemented, 77 partial, and 98 missing parent rows; clause-level assessment is 161/761.

Use this order for new completion work:

  1. WML-2 and TRN-7 may proceed in parallel.
  2. WML-3 follows WML-2.
  3. REN-4 and WMLS-5 follow WML-3.
  4. WAE-6 follows runtime, rendering, and script closure.
  5. WSP-8 follows TRN-7 and WAE-6.
  6. INT-9 and then REL-10 close cross-layer and release evidence.
  7. OPT-11 and ENH-12 remain post-REL-10 capability lanes.

Existing downstream work may continue as an isolated foundation, but it cannot close its sprint or satisfy an upstream obligation early. The blocked source item SRC-006 gates public redistribution only and does not block internal implementation or evidence work.

Current Snapshot (as of 2026-07-25)

This snapshot replaces the original kickoff view and reflects the current post-transport-burn-down state.

Ticket Lane Current status Immediate dependency action
A5-01 engine/runtime done request-shaped history fidelity and deterministic restore semantics are covered
A5-04 engine + browser done viewport-editable text input baseline is closed
A5-05 engine + browser done select/option interaction baseline is closed
A5-06 engine + browser + transport done form-state submit hardening is closed for the active MVP lane
A5-07 browser done blocking startup/navigation/browser hot-path remediation landed in #109/#110
R0-02 engine + browser + transport done closed with deterministic host/runtime request-fidelity coverage
R0-03 engine + browser done closed with history/context fidelity integration evidence
W0-05 wavescript/runtime done timer→script→dialog host capability ordering is executable and deterministic; strict Dialogs/WMLS-5 remains downstream
W0-06 engine/wavescript done strict structural closure continues in W1-02
W1-06 wavescript/runtime in-progress finalize remaining fatal/non-fatal fixture classes and close checklist split
D0-01 engine + browser + docs todo next planning-ready contract/architecture slice after active runtime correctness work
T0-18 transport done retransmission/duplicate/NACK hold-off baseline is closed
T0-19 transport done WDP ingress and UDP mapping baseline is closed
T0-20 transport done WSP registry/header/session baseline is closed
T0-21 transport/security done explicit WTLS boundary and minimal reliability lane are now closed
T0-22 transport done replay promotion gate is closed and seed-backed
T0-24 transport/docs done seed corpus is formalized and promotion-gated
T0-25 docs/spec-processing done external vector adoption sweep is closed
T0-26 transport/browser/docs done local Kannel readiness gate is explicit and runnable
M1-08 maintenance done boundary-module decomposition is complete; new hotspots require additive tickets
M1-16 maintenance/security done payload-size guardrails are closed for the current transport/engine/browser boundary

Sprint 1 Review: Bedrock + Networking Unblockers

Goal

Close committed bedrock compliance work while unblocking networking P0 blockers through dependency tickets.

Must Complete (P0)

  1. A5-01 history entry fidelity.
  2. R0-02 inter-card process-order conformance.
  3. R0-03 history/context fidelity completion.
  4. W0-06 bytecode verification gates follow-up.
  5. T0-10 WSP assigned-number registry conformance fixtures.
  6. T0-11 WSP capability-bound and negotiation-limit enforcement.
  7. T0-12 Wireless Profiled TCP compatibility profile declaration.
  8. T0-13 SMPP adaptation scope gate and fixture baseline.
  9. T0-14 networking profile decision record and migration gates.
  10. T0-08 WTP replay-window conformance follow-up.
  11. T0-09 WSP connectionless primitive-profile conformance.
  12. T0-16 spec queue canonicalization follow-up.

Stretch (only if all P0 are green)

  1. W1-02 bytecode structural verification closure.
  2. Add a new maintenance ticket only if active work exposes a concrete high-churn hotspot.

Exit Gates

  1. Bedrock tickets A5-01, R0-02, R0-03, W0-06 are done with mapped tests in docs/waves/SPEC_TEST_COVERAGE.md.
  2. Networking unblockers T0-10, T0-11, T0-12, T0-13, T0-14, T0-08, T0-09, T0-16 are done.
  3. No P0 ticket is left in blocked due to unresolved dependency chain.

Current result:

  1. Transport/spec unblockers are complete.
  2. A5-01 is now closed by engine history/back evidence plus browser request-shaped host-history coverage.
  3. The original Sprint 1 snapshot overstated closure on at least one engine/runtime item and should not be used as the current source of truth.

Sprint 2 Review: Networking Protocol-Core Blockers

Goal

Close protocol-native transport P0 blockers and make replay harness work executable.

Must Complete (P1)

  1. T0-19 WDP datagram trait + UDP port mapping baseline.
  2. T0-18 WTP retransmission/NACK hold-off policy implementation.
  3. T0-20 WSP header registry completion and unknown-token policy. done

Follow-on (same sprint if capacity allows)

  1. T0-22 networking interop replay harness and golden event corpus.

Exit Gates

  1. T0-19, T0-18, T0-20 are done with deterministic fixture coverage.
  2. T0-22 is done.
  3. Promotion-gate preconditions in docs/waves/networking-migration-readiness-checklist.md are updated with current evidence.

Current result:

  1. Sprint 2 transport goals are complete.
  2. T0-24, T0-25, and T0-26 also landed ahead of the original plan.

Sprint 3 Review: Promotion Hardening + WTLS Boundary

Goal

Finalize replay-driven promotion evidence and close explicit WTLS boundary posture.

Must Complete

  1. T0-22 (if not already done in Sprint 2).
  2. T0-21 WTLS phase boundary and minimal handshake reliability lane (default disabled).

Optional

  1. T0-24 PCAP seed corpus spike.
  2. T0-25 external conformance/vector source sweep.
  3. M1-09 frame migration kickoff (F0-* only) if P0/P1 lanes are stable.

Exit Gates

  1. Networking promotion gate rule from docs/waves/NETWORKING_GAP_MASTER.md is fully satisfiable by committed evidence.
  2. WTLS posture is explicit, default-safe, and test-backed (no-op vs minimal active mode).

Current result:

  1. T0-21, T0-24, and T0-25 are complete.
  2. Networking protocol-policy closure is no longer the pacing constraint, but live desktop/browser ingress still needs a native fetch lane instead of the legacy HTTP gateway bridge.

Targeted Sprint Recommendation: Runtime Fidelity + Debug Boundary Reset (2026-03-15 onward)

Goal

Now that the interactive forms lane and browser responsiveness remediation are landed, shift the active sprint back toward runtime correctness closure and the next planning-ready boundary definition.

Must Complete (P0/P1)

  1. D0-01 debug connector contract and architecture baseline.
  2. W1-06 fatal/non-fatal script error taxonomy closure.

Completed foundation:

  • W0-05 timer/dialog integration baseline.

Follow-on (only if capacity remains)

  1. W1-06 fatal/non-fatal script error taxonomy closure.
  2. M1-09 frame migration kickoff (F0-* only).
  3. additive hotspot cleanup only when active work identifies a specific boundary problem.

Concrete commit-order recommendation

  1. docs(debug): lock engine debug connector contract and boundary rules
  2. fix(runtime): close remaining fatal/non-fatal script taxonomy gaps
  3. feat(host): start frame migration only after the above boundaries are stable

Implementation reference:

Exit Gates

  1. History/session fidelity gaps are reduced without reopening the now-stable form/browser responsiveness lane.
  2. Timer/dialog runtime semantics are host-integrated and deterministic.
  3. Debug connector architecture is contract-ready before another host-boundary migration starts.
  4. A fresh planning cycle is only needed once those three items materially change the execution picture.

Parallel Follow-on Sprint Recommendation

Current recommendation after all merged implementation workstreams:

  1. Mapping/evidence lane: preserve WML-201’s completed 76-row evidence projection and 174/174 direct WML-clause mapping.
  2. Engine lane, first: preserve completed WML-202 access-policy, root-language, and card-context evidence (30/30 direct clauses), then close the residual mandatory WML-204 vdata/HREF conversion and field/control validation gate without reopening WML-202 history.
  3. Engine lane, next: close WML-203 mandatory prologue and DTD content-model enforcement, then extend WML-205’s deterministic load taxonomy across remaining element errors and host fetch/access failure atomicity. These residual WML-2 slices overlap parser/runtime validation tests and should land serially.
  4. Transport lane: preserve the completed schema-v2 selected WDP replay boundary for TRN-706 and keep its WTP family gap explicit under additive TRN-704/TRN-705 follow-ups. Do not activate WTP or connection-oriented WSP to manufacture completion.
  5. Browser lane: finish WBP-00 baseline decisions and WBP-01 integration evidence around the shell seams landed in #343. Then run WBP-02 through WBP-05 as parallel leaf-component slices with one owner for root-shell, global-style, copy, and example-manifest integration. W1-06, D0-01, frame migration, and general maintenance remain non-preemptive until these upstream Class C gates materially change. WSP-801/WSP-802 may continue only as isolated downstream foundation work; WSP-8 cannot close before TRN-7 and WAE-6.

Completed this sprint:

  1. interactive text-input and select-control viewport editing
  2. native/browser submit hardening for the active form lane
  3. browser responsiveness and UI-blocking remediation
  4. transport/engine payload-size guardrails for active boundaries
  5. story-driven host-sample and Waves-browser acceptance harnesses
  6. WML-204 input/select direct evidence (23/23 mapped clauses)
  7. WML-203 WML/WBXML evidence tranche (49/49 mapped clauses)
  8. TRN-701 WDP, TRN-702 constrained payload, and TRN-703 WCMP direct evidence
  9. WML-203 schema-v2 WDP SDU -> fetch/WBXML decode -> native engine parity, paired with executable WASM text-deck rendering evidence
  10. WML-201 direct SCR/clause evidence projection and declared-family mapping
  11. WML-202 root/head/access/meta retention and deterministic parser evidence
  12. WML-205 structured engine load diagnostics and recovery story
  13. WML-204 grouped-control syntax validation and executable story coverage
  14. Waves desktop product direction plus the first WBP-01 shell component seams

Capacity and WIP Rules

  1. Max two concurrent P0/P1 tickets per lane (engine, transport, browser).
  2. Never start P2 work when any P0/P1 ticket is blocked without an owner-assigned unblock action.
  3. Maintenance tickets may run in parallel only when they do not delay P0/P1 acceptance gates.

Weekly Operating Cadence

  1. Monday planning sync: confirm active ticket set and dependency risks.
  2. Mid-week gate check: verify test evidence and cross-board status sync.
  3. Friday closeout: update WORK_ITEMS.md, SPEC_TEST_COVERAGE.md, and this plan in the same PR(s).

Change-Control Rule

If a new high-priority ticket appears, insert it into this plan by explicit priority tier and dependency impact; do not bypass current P0/P1 gates without documented reason.

Merge Readiness Checklist

  1. docs/waves/WORK_ITEMS.md points to this file as canonical sprint ordering.
  2. docs/waves/MAINTENANCE_WORK_ITEMS.md and docs/wml-engine/work-items.md reference this file for active sprint priority.
  3. Sprint 1 tickets are tracked with current status fields on their source boards before code execution starts.