Acceptance
Definition of done
- Map the concrete WAP-202 sections 5.1, 5.2, and 5.5 clauses supported by the existing general-WCMP fixtures and implementation tests directly to TRN-710 without changing TRN-703 status.
- Keep WAP-202 sections 5.4.1-.7 bearer encapsulations and WAP-159 SMPP adaptation explicitly unimplemented and deferred.
- Keep the capability mapping outside the 198 selected parents, the selected CDPD/IPv4 profile, and the TRN-7-CL-C gate; do not activate WTP or connection-oriented WSP.
Outputs
Artifacts to create or change
Direct normative-clause mapping and executable evidence links for the completed TRN-703 non-IP general-WCMP capability
Evidence
How closure is proven
cargo test --manifest-path transport-rust/Cargo.toml --lib network::wcmpnode scripts/check-wap-selected-normative-clauses.mjsnode scripts/wap-context-pack.mjs TRN-710node scripts/check-wap-knowledge-graph.mjs